Open the Work Ctr. Sched. by Lot Size window.

Shows a work center's schedule according to lot size. The report shows the start time and run time of each batch of a larger production run. The report needs to be run against a WIP item that has batches. This report has an RDLC layout.

The report is available from Departments/Manufacturing/Execution/Reports.

Tip