Open the Work Center Load Chart window.

FactBox available from the Shop Floor role center. Displays available versus allocation capacity. This part shows how much work is planned. Green shows available capacity, blue shows allocated time, and red shows what has been over scheduled.

The period length can be changed between day, week and month, and the period displayed can be moved using the Previous Period and Next Period buttons.

Tip

See Also

About Shop Floor Role Center